Case Study: Beechwood School, Luton
Client
Beechwood School
Location
Beechwood School, Luton
Scheme Details
Architectural design for 6 additional classrooms, a large school library, a new entrance lobby and reception, a reprographics area, additional play areas, the introduction of discrete changing areas for children with disabilities, creation of safe pedestrian walkways into the school and an electronic barrier at the entrance to the school.
Fit Out Project Value
£3m
Millbridge Role
Project Management, Contract Administration, Cost Consultancy, Architectural Design
Timescale
12 months, commencing on site April 2009